← TRACKS 4 TRUCKERS™Our Community Blog
← The Highway Hobo
Roads & Route Planning

I-95 and I-476 Ramp Closures Nov. 6–8: Delaware County Drivers Need Two Night Plans

Published · TRACKS™ Editorial

MacDade Boulevard entrances close Friday night; exits and the northbound I-95-to-I-476 connection close Saturday night. Match the ramp movement to the overnight window.

FRIDAY NIGHT: Nov. 6, 10 p.m.–Nov. 7, 9 a.m.; FRIDAY MOVEMENT: MacDade Boulevard to I-95, both directions.; SATURDAY NIGHT: Nov. 7, 10 p.m.–Nov. 8, 9 a.m.; SATURDAY MOVEMENT: I-95, both directions, to MacDade Boulevard.
Original editorial diagram. Schedule diagram, not a road or detour map. Weather may change work.

Friday night affects entering I-95

PennDOT’s October 29 notice schedules closures of the ramps from MacDade Boulevard to both northbound and southbound I-95 in Ridley Township. The window begins Friday, November 6, at 10 p.m. and runs until 9 a.m. Saturday. Times are local Eastern time. If a delivery ends late Friday or early Saturday, check the route back to the interstate; an open arrival approach does not establish that the departure ramp will be available.

Saturday night affects leaving I-95 and reaching I-476

From 10 p.m. Saturday, November 7, until 9 a.m. Sunday, the scheduled closures reverse the MacDade movement: ramps from both directions of I-95 to MacDade Boulevard close. The ramp from northbound I-95 to northbound I-476 also closes during that Saturday-night window. The notice concerns those ramps rather than announcing a shutdown of every mainline lane on I-95 or I-476.

AFFECTED CONNECTION: Northbound I-95 to northbound I-476 ramp.; CLOSURE WINDOW: Saturday 10 p.m. to Sunday 9 a.m.; PLANNED RESPONSE: Follow posted detours; check vehicle suitability.; BEFORE DEPARTURE: Recheck current conditions and the work schedule.
Original editorial diagram. Connection reference; it does not certify a truck detour or predict a delay.

Give dispatch the movement, not just the interchange name

Our planning suggestion is to write each affected leg in plain language: entering I-95 from MacDade, leaving I-95 for MacDade, or connecting northbound I-95 to northbound I-476. Pair it with the relevant night. That makes the note useful to a driver who did not prepare the trip and helps a receiver see why an appointment or departure time needs review. Do not assign a precise delay estimate; PennDOT’s notice does not provide one.

Recheck the detour before the load moves

PennDOT says signed detours will be in place and the schedule depends on weather. Review current conditions through 511PA before departure, and verify that any alternate suits the vehicle, load and permit terms. If the truck’s route depends on one of these ramps, confirm the customer’s truck entrance and departure instructions as separate steps. Keep the agency link with the trip notes so dispatch can check for a changed window instead of reusing an old screenshot.

Sources & verification

Reporting facts are attributed to the sources above. Practical takeaways and labeled calculations are The Highway Hobo’s analysis. Request a correction.