← TRACKS 4 TRUCKERS™Our Community Blog
← The Highway Hobo
Roads & Route Planning

Brooklyn Fort Hamilton Parkway Bridge Closes Nov. 9–13: Check the Local Truck Approach

Published · TRACKS™ Editorial

NYSDOT plans a daytime closure of the bridge over the Gowanus Expressway. Check whether your delivery uses the crossing, then verify a truck-legal detour.

Schedule cards distinguish the bridge closure from I-278 below.
Original editorial diagram. This schedule is weather dependent and does not depict a detour map.

Which road closes in Brooklyn

NYSDOT’s November 6 advisory calls for a full closure of the Fort Hamilton Parkway bridge over the Gowanus Expressway from Monday, November 9, through Friday, November 13. The hours are 10 a.m. to 3 p.m. Eastern each day, weather permitting. The notice covers the road on the bridge. It does not announce a closure of the I-278 mainline underneath. That distinction tells a through driver and a local delivery driver to check different parts of the trip.

Plan for the last few blocks of a delivery

Check whether the truck’s receiving entrance is on the far side of the affected crossing. A customer address or a pin placed in the middle of a building may not tell you which approach reaches the dock. Call ahead for the truck entrance and any site instructions before setting the appointment or departure time. If the delivery falls within the closure window, give dispatch the affected approach and the alternate you have verified, rather than just noting a vague delay on the Gowanus.

Use the signed detour and check truck routing

NYSDOT directs motorists to follow the signed detour. The advisory does not give a turn-by-turn truck route, so avoid guessing the turns from a car navigation app. NYC DOT publishes distinct local and through truck networks and notes that most city parkways prohibit trucks and commercial vehicles. Check the official network, signs and applicable vehicle limits for the actual movement. The word Parkway in this closure’s name is not a substitute for checking what is posted on the route you intend to use.

Four panels cover the receiving entrance, hours, truck route and live conditions.
Original editorial diagram. A route planning checklist, not authorization to use a particular street.

Recheck the work window before the truck moves

Use 511NY for current travel information and check from a safe stop if plans change on the road. The published 3 p.m. end time is a schedule, not confirmation that the crossing has reopened on a particular day. Tell the receiver which part of the approach is affected so an updated arrival estimate can reflect the real restriction.

Sources & verification

Reporting facts are attributed to the sources above. Practical takeaways and labeled calculations are The Highway Hobo’s analysis. Request a correction.