← TRACKS 4 TRUCKERS™Our Community Blog
← The Highway Hobo
Roads & Route Planning

Philadelphia I-95 North at Girard Point Bridge: Two Lane Closures After Midnight Nov. 9–13

Published · TRACKS™ Editorial

PennDOT plans one closed lane from 9 p.m. to midnight and two from midnight to 5 a.m. on northbound I-95 between Enterprise Avenue and Broad Street.

A schedule shows one northbound lane closed before midnight and two after midnight.
Original editorial diagram. The diagram counts lanes closed, not lanes remaining.

The same crossing has two overnight work periods

PennDOT’s November 4 advisory lists nighttime lane closures on northbound I-95 from Enterprise Avenue to Broad Street (Route 611) in Southwest Philadelphia for the November 9–13 work period. Crews plan to close one lane between 9 p.m. and midnight and two between midnight and 5 a.m. The hours are Eastern. The advisory warns of backups but does not provide a truck-specific delay estimate.

Northbound traffic is affected by work above it

The agency says crews will install shielding on the underside of the overhead southbound bridge. That explains why the listed traffic restrictions are northbound even though the work involves the southbound structure. It also helps distinguish this advisory from other I-95 work elsewhere in the Philadelphia area. The two-lane closure refers to two lanes being taken out of use, not a full closure of the northbound route.

Estimate when the truck reaches the work zone

An appointment time alone does not tell you which restriction a truck will encounter. For example, on a scheduled work night a truck expected at the bridge at 11:30 p.m. is in the one-lane closure period. If loading runs late and that arrival moves to 12:30 a.m., it falls in the two-lane closure period instead. Use that difference to decide when to check traffic again and when to let the receiver know the ETA has changed.

Two arrival examples show how crossing midnight changes the expected lane restriction.
Original editorial diagram. This timing example does not forecast a queue or travel time.

Check conditions before changing an approach

PennDOT says the work is weather dependent. Use 511PA before departure, and verify live conditions at a safe stop if the arrival estimate changes. A detour that looks shorter on a passenger-car map may not fit the vehicle, load or permit. Keep the direction, endpoints and midnight transition in the trip notes so the next dispatcher sees the same restriction.

Sources & verification

Reporting facts are attributed to the sources above. Practical takeaways and labeled calculations are The Highway Hobo’s analysis. Request a correction.