← TRACKS 4 TRUCKERS™Our Community Blog
← The Highway Hobo
Roads & Route Planning

State College Route 26 Work Nov. 12: Check Your U.S. 322 Exit Turn Lane

Published · TRACKS™ Editorial

PennDOT plans a northbound lane and shoulder closure on East College Avenue, plus a turning-lane change at the eastbound U.S. 322 State College exit.

Cards show the northbound segment, affected lane and non-exact time window.
Original editorial diagram. Schedule reference, not a road layout.

Thursday work narrows East College Avenue

PennDOT’s November 9 notice schedules exploratory excavation on Thursday, November 12, at a bridge over U.S. 322 in College Township. The right lane and shoulder of northbound Route 26, East College Avenue toward Lemont, are to close between Elmwood Street and Clover Road. The agency expects work from morning to mid-afternoon but gives no exact start or finish hour.

The exit ramp has a specific turning change

At the end of the eastbound U.S. 322 State College exit ramp, PennDOT plans to close the center turning lane. Left turns onto East College Avenue are to use the left lane. Right turns remain permitted using the right lane. A message that says only “ramp work” omits the detail a driver needs when approaching the intersection. This notice does not announce that the whole exit ramp is closed.

Three cards distinguish the closed center lane and permitted left and right turns.
Original editorial diagram. Movement reference; not a scale intersection diagram.

Confirm which entrance the truck needs

Before dispatch, compare the receiving address with the actual truck entrance and the direction of approach. If reaching the dock uses Route 26 toward Lemont, include the northbound restriction in the trip notes. Check the departure separately: the route back to U.S. 322 may use a different movement from the arrival. Ask the receiver about access instructions without assuming a passenger-car entrance is suitable for the load.

Do not invent a precise reopening time

For a Thursday afternoon delivery, check current conditions instead of treating “mid-afternoon” as a guaranteed reopening at a particular hour. PennDOT says weather and other circumstances can change the schedule. Use 511PA and posted signs, and review any route change from a safe stopping location. If a delay changes the appointment, tell the receiver which movement is affected so the revised arrival estimate has a clear basis.

Sources & verification

Reporting facts are attributed to the sources above. Practical takeaways and labeled calculations are The Highway Hobo’s analysis. Request a correction.