← TRACKS 4 TRUCKERS™Our Community Blog
← The Highway Hobo
Roads & Route Planning

Luzerne County I-81 Overnight Closures: Southbound Nov. 16, Northbound Nov. 18

Published · TRACKS™ Editorial

PennDOT plans two different detours for I-80 bridge-beam installation. Single-lane traffic begins four hours before each overnight closure.

The southbound and northbound closure windows are paired with the earlier lane restrictions.
Original editorial diagram. Schedule reference; not a prediction of travel delay.

Match the night to the direction

PennDOT’s November 12 advisory schedules an I-81 southbound closure Monday night, November 16, and a northbound closure Wednesday night, November 18, in Luzerne County. Each closure runs from 8 p.m. to 6 a.m. the next morning, Eastern time. On both dates, traffic is reduced to one lane from 4 p.m. to 8 p.m. before the closure. The work installs beams for an I-80 bridge over I-81.

The two signed routes are different

For Monday’s southbound closure, the published route uses Exit 151B to I-80 west, Exit 256, Route 93 south and Tomhicken Road to return to I-81 south. Wednesday’s northbound route uses Exit 151A to I-80 east, Exit 262, Route 309 north, then I-80 west to Exit 260B and I-81 north. Use the full official turn instructions and current signs; reversing one night’s route does not produce the other night’s plan.

Two paired sequences distinguish the southbound and northbound detours.
Original editorial diagram. Route sequence, not a scale map or permit clearance.

Check the corridor arrival before the appointment

Our editorial recommendation is to put the expected arrival at the affected interchange beside the dock appointment. A truck approaching Monday at 5 p.m. falls in the planned lane-restriction period; a southbound approach at 10 p.m. falls in the closure window. These examples identify the scheduled traffic pattern, not a predicted queue length. A loading delay can change which window the driver reaches, so keep dispatch informed when the departure time changes.

Review the detour for the actual load

The notice provides general signed detours, not a separate authorization for every truck dimension or permitted movement. If a load has route conditions, have the responsible carrier personnel confirm how the closure affects that movement before departure. Keep the correct direction-specific notice accessible to the driver and verify current conditions at 511PA. Review a changed route from a safe stopping location. If the detour affects arrival, tell the receiver the specific closure rather than describing all of I-81 as closed for two days.

Sources & verification

Reporting facts are attributed to the sources above. Practical takeaways and labeled calculations are The Highway Hobo’s analysis. Request a correction.